Eligibility :
Piping Engineers / EPC Professionals
Suvidya Institute of Technology Pvt. Ltd.
is now affiliated with ECITB which is Engineering Construction Industry Training Board of United kingdom for Training Program
'
SYLLABUS |
Module |
Name |
Description |
Training Hours |
PLD-01 |
Equipment Layout |
· Role knowledge, Function of the plant designer, Plant design steps, Site area layout, Conceptual and block models (electronic)
· Sources of design information
· Requirements of a safe and successful layout
· Philosophy of layout in ISBL and OSBL
· Philosophies of layout and arrangement – offshore
· Achieving safe plant layout and arrangement |
18 Hours |
PLD-04 |
Crane and Access |
· Access ways and in plant roads
· Typical space requirements for equipment
· Cranes
· Lifting equipment
· Access layout |
18 Hours |
PLD-08 |
Pipe Rack |
· Piperack and sleeper’s construction and structure
· Bent spacing and pipe rack width
· Piperack elevations and pipe rack intersections
· Thermal expansion and pipe flexibility
· Fireproofing, anchors and supports
· Underground Piping |
18 Hours |
PLD-10 |
Flare |
· Introduction to flares
· Knock-out drums and liquid/water seals
· Safety/relief systems
· Flare tips
· Supporting flare stacks
· Instrumentation and control systems |
06 Hours |
PLD-12 |
Storage tanks |
· Introduction to storage tanks
· tank storage areas
· storage tanks & their piping connections
· requirements and good layout practice for LPG and refrigerated gas storage
· to tank features and associated equipment |
12 Hours |
PLD-13 |
Piping Design |
· Information required to begin design, Basis of design, Implementation of pipe work codes and standards, understand what a piping specification is and when to use one.
· Piping specifications, Basics of piping materials, Design fundamentals, Process considerations, Elevations, Economic considerations, Aesthetic considerations
· Consistent and common layouts
· Basics of flanges, Threads, Pipe welding, Basics of valves |
18 Hours |
PLD-24 |
Vessel |
· vessel construction and structure.
· Supporting vessels
· Vessel internals, Vessel layout
· Access to vessels, Piping arrangements
· Vessel Instrumentation
· Vessel maintenance |
12 Hours |
PLD-25 |
Heat Exchangers |
· Exchanger construction and structure
· Supporting exchangers
· Access to exchangers
· Air coolers
· Reboilers |
12 Hours |
PLD-26 |
Pump |
· Pump construction and structure
· Steam turbine drives, Temporary Strainers and Selecting a Centrifugal Pump.
· Net positive suction head (NPSH)
· Piping to pumps |
12 Hours |
PLD-28 |
Fired Heaters |
· Fired heater construction and structure
· Fired heater internals
· Air delivery
· De-coking and soot blowing
· Piping general arrangements to fired heaters |
12 Hours |